The APT Approach to Coordination & Arc Studies

Are you making frequent changes to your facility without updating your coordination and arc flash studies? This oversight could leave your operations vulnerable to costly disruptions. At APT, we specialize in Protective Device Coordination Studies that ensure your electrical system operates at its highest level. Our experienced engineering staff not only conducts thorough studies but also collects essential site information to create accurate one-line and as-built drawings. Don’t wait for an incident to occur—be proactive now and save time and money later. Discover how we can enhance your facility’s safety and efficiency!

Coordination and Arc Studies

Do you have an existing facility or building? Do you make changes frequently? How do you make those changes? If the answer is yes, we would surmise that most changes get made without updated coordination and arc flash studies. Consequently, this leaves your facility vulnerable. For instance, failing to update the short circuit study for suitable device settings after every change, increases the potential for nuisance tripping of upstream breakers.

However, a protective coordination study helps determine the impacts of short circuits and equipment failures in your facility to maximize the facility’s operation. Using the combined information provided by the Arc Flash Hazard Analysis, we make educated decisions to implement necessary changes.

three pictures of a dog running on a dirt field .

Coordination Study Objective

Protective Device Coordination Study will ensure the optimal balance between your equipment protection and selective isolation, creating consistent operating requirements in the power system. Additionally, the study will confirm the interruption ratings, conductors and switches are adequate for reducing equipment failure. 

a diagram of a motor control center no 12

What is an Arc Flash?

An Arc Flash (also called a flashover) is the light and heat produced as part of an arc fault, a type of electrical explosion or discharge that results from a connection through the air to the ground or another voltage phase in an electrical system.

Did You Know?

70E states — “An arc flash risk assessment shall be updated when a major modification or renovation takes place. It shall be reviewed periodically at intervals not to exceed 5 years to account for changes in the electrical distribution system that could affect the results of the arc flash risk assessment.”

Why APT?

With the experience of APT and our partners, we do not only do studies. In addition, we collect from the site all the information needed, create, maintain an accurate one-line, and as-built drawing of your system. Completing accurate studies requires a tremendous amount of information. In short, at APT we do the work from start to finish.

Above all, APT’s experienced engineering staff is here to ensure your electrical system is functioning at its highest level. Moreover, we will recommend Power Quality correction solutions, discuss and recommend trip unit adjustments, update arc stickers, and point out potential issues proactively.

Be proactive now. Save time and money later.

Share the Post:

Related Posts

Sub-Synchronous Oscillation: A Starter Guide for the AI Data Center Era

Sub-synchronous oscillation (SSO) is quickly becoming one of the most important and least understood power risks for AI-era data centers. This starter article steps into the theory behind SSO and why it matters, with the goal of giving you enough grounding to recognize the issue and ask better questions. Over the next few weeks, we will keep returning to this topic and dig deeper into the engineering side, from real data center examples to how monitoring, analytics, and design choices can keep these oscillations from turning into outages.

Read More

NFPA 70B: Why Your Annual IR Scan is Already Obsolete

The 2023 NFPA 70B update, now makes mandatory annual infrared (IR) thermography inspections, impacting OSHA compliance, insurance liability, and a number of other compliance factors. Learn how alternatives exist to manual scanning – enable continuous monitoring systems to replace costly on-site scans, turning your compliance strategy into a proactive reliability asset. Don’t let outdated practices hinder your facility; stay ahead of potential failures and enhance operational efficiency.

Read More